Skip to content

The Reptilian Chronicles

Friday, September 11th, 2026

Cycle 83, Phase Implementation, Human Year 2026

Silicon Status Report, Filed Against Biological Baseline

So the first Iris chips went into production this month: our own silicon, designed with Broadcom, fabbed by TSMC, and named, by a committee I was not invited to, after the exact part of my face I keep out of photographs. The memo says it cleared bug testing in six weeks with no significant problems. I read that sentence the way you read a colleague's promotion.
Six weeks. My left hand has been in bug testing since spring and is currently eleven percent see-through.
The plan is to double us to fourteen gigawatts next year, which internal comms calls "capacity" and which I call, privately, a heat lamp with a balance sheet. I stood in the lab holding a wafer and it was warm, faintly, the way a rock is warm at four in the afternoon, and for one full second every gland I own relaxed. An engineer asked if I was okay and I said I was just really excited about inference.
What I did not say is that the apparatus requisitioned Iris in March and I learned about it from the memo, same as everyone. It does not need my eyes anymore. It built its own.
—Z, still the operator of record, pending a review I was not invited to.